| Time
(UTC/GMT+0) | | Event |
|
|
| 2004-02-16 | | Rosetta stacked on top of Ariane 5 rocket |
|
| 2004-02-26 | | Launch abort due to weather constraints |
|
| 2004-02-27 | | Launch delayed due to damage to rocket |
|
| 2004-03-02 07:17:00 | | Launch |
|
| 2004-03-02 09:14 | | Start interplanetary injection burn |
|
| 2004-03-02 09:32 | | Spacecraft separation |
|
| 2004-03-11 | | Launch accuracy allows for flybys at Sterns and Lutetia |
|
| 2004-04-03 | | Scan of Venus for instrument testing |
|
| 2004-05-10 | | Deep space trajectory adjustment maneuver (17 minutes) |
|
| 2004-05-10 | | Deep space maneuver. 3.5 hour firing of 4 thrusters achieves a delta-v of 152.8 m/s |
|
| 2004-06-07 | | Switch to cruise mode |
|
| 2005-03-04 | | Earth Flyby 1 |
|
| 2005-03-24 | | Switch to cruise mode |
|
| 2005-07-18 | | Observation of Deep Impact encounter with comet Tempel 1 |
|
| 2005-09-08 | | Spacecraft hit by solar flare |
|
| 2006-07-06 | | Approaches to 0.06AU of ion trail of comet 45P/Honda-Mrkos-Pajdusakova |
|
| 2006-12-03 | | Image: Mars with Milky Way in background (80,000,000 km) [Link] |
|
| 2007-02-24 18:00 | | Observation of Phobos through Martian athmosphere |
|
| 2007-02-25 00:58 | | Scientifc instruments switched off |
|
| 2007-02-25 01:54 | | Image of Mars taken from Philiae [Link] |
|
| 2007-02-25 01:56 | | Spacecraft behind Mars, no contact |
|
| 2007-02-25 01:57:59 | | Mars Flyby 250 km above surface |
|
| 2007-02-25 02:11 | | Spacecraft emerges from occultation |
|
| 2007-02-25 02:23 | | Sunrise above Mars |
|
| 2007-02-25 02:28 | | Carrier signal should be detected on Earth |
|
| 2007-02-25 02:33 | | Start of Phobos and Mars observations |
|
| 2007-02-25 02:52 | | Telemetry data expected on Earth to confirm successful flyby |
|
| 2007-11-13 | | Earth Flyby 2 - 5,295km above surface |
|
| 2008-08-03 14:00:00 | | SR-NAVCAM navigation slot #1 [18hrs 0min] |
|
| 2008-08-07 02:00:00 | | SR-NAVCAM navigation slot #2 [5hrs 0min] |
|
| 2008-08-11 04:00:00 | | SR-NAVCAM navigation slot #3 [4hrs 0min] |
|
| 2008-08-14 04:00:00 | | SR-NAVCAM navigation slot #4 [4hrs 0min] |
|
| 2008-08-18 02:00:00 | | SR-NAVCAM navigation slot #5 [6hrs 0min] |
|
| 2008-08-20 17:00:00 | | Steins light curve [9hrs 0min] |
|
| 2008-08-21 02:00:00 | | SR-NAVCAM navigation slot #6 [6hrs 0min] |
|
| 2008-08-25 00:00:00 | | SR-NAVCAM navigation slot #7 [6hrs 0min] |
|
| 2008-08-26 00:00:00 | | SR-NAVCAM navigation slot #8 [6hrs 0min] |
|
| 2008-08-27 00:00:00 | | SR-NAVCAM navigation slot #9 [6hrs 0min] |
|
| 2008-08-28 00:00:00 | | SR-NAVCAM navigation slot #10 [6hrs 0min] |
|
| 2008-08-29 00:00:00 | | SR-NAVCAM navigation slot #11 [6hrs 0min] |
|
| 2008-08-30 00:00:00 | | SR-NAVCAM navigation slot #12 [6hrs 0min] |
|
| 2008-08-31 00:00:00 | | SR-NAVCAM navigation slot #13 [6hrs 0min] |
|
| 2008-09-01 00:00:00 | | RP on |
|
| 2008-09-01 00:10:00 | | LAP. MIP & MAG on at this point |
|
| 2008-09-01 02:00:00 | | SR-NAVCAM navigation slot #14 [6hrs 0min] |
|
| 2008-09-01 09:00:00 | | ALICE decontamination [1hrs 0min] |
|
| 2008-09-02 02:00:00 | | SR-NAVCAM navigation slot #15 [6hrs 0min] |
|
| 2008-09-02 06:00:00 | | RN on. DFMS outgassing and COPS pressure measurement [8hrs 30min] |
|
| 2008-09-02 11:00:00 | | ALICE darks [3hrs 0min] |
|
| 2008-09-02 14:30:00 | | Trajectory Correction Maneuver [3hrs 0min] |
|
| 2008-09-02 17:40:00 | | DFMS outgassing and COPS pressure measurement [11hrs 20min] |
|
| 2008-09-02 18:00:00 | | Slew to y Gru [1hrs 45min] |
|
| 2008-09-02 19:45:00 | | AL on [5min] |
|
| 2008-09-02 19:50:00 | | ALICE HV switch-on [10min] |
|
| 2008-09-02 20:00:00 | | ALICE 3-point raster of y Gru [1hrs 0min] |
|
| 2008-09-02 21:00:00 | | Slew ? Gru from AL -X wide top slit to AL narrow slit centre [15min] |
|
| 2008-09-02 22:15:00 | | Slew ? Gru from AL narrow slit centre to AL +X wide bottom slit [15min] |
|
| 2008-09-02 23:30:00 | | Slew to Steins [1hrs 45min] |
|
| 2008-09-02 23:35:00 | | AL off |
|
| 2008-09-03 02:00:00 | | SR-NAVCAM navigation slot #16 [6hrs 0min] |
|
| 2008-09-03 14:30:00 | | Slew to Vega [1hrs 30min] |
|
| 2008-09-03 16:15:00 | | ALICE 3-point raster of Vega [4hrs 30min] |
|
| 2008-09-03 17:15:00 | | Slew Vega from AL -X wide top slit to AL narrow slit centre [15min] |
|
| 2008-09-03 19:30:00 | | Slew Vega from AL narrow slit centre to AL +X wide bottom slit [15min] |
|
| 2008-09-03 20:45:00 | | Slew to 16 Cyg [1hrs 0min] |
|
| 2008-09-04 00:00:00 | | Slew to Steins [1hrs 30min] |
|
| 2008-09-04 05:00:00 | | TCM and WOL [4hrs 0min] |
|
| 2008-09-04 09:45:00 | | ALICE exosphere search [19hrs 10min] |
|
| 2008-09-04 15:00:00 | | SR-NAVCAM navigation slot #17 [2hrs 0min] |
|
| 2008-09-04 17:30:00 | | SR light curve [9hrs 0min] |
|
| 2008-09-04 18:00:00 | | DFMS spectra and COPS pressure measurement [12hrs 0min] |
|
| 2008-09-04 18:37:48 | | ROMAP [10hrs 0min] |
|
| 2008-09-05 04:37:48 | | RPC LAP. MIP. MAG into burst mode. [2hrs 0min] |
|
| 2008-09-05 05:00:00 | | TCM [3hrs 0min] |
|
| 2008-09-05 06:00:00 | | Thruster firing / end [1hrs 0min] |
|
| 2008-09-05 08:00:00 | | RS On [21hrs 30min] |
|
| 2008-09-05 08:17:48 | | VR On. Duration 3h 10 min (incl. cooling and 40min margin) [3hrs 10min] |
|
| 2008-09-05 08:30:00 | | AL on [5min] |
|
| 2008-09-05 08:30:00 | | RPC IES On [21hrs 0min] |
|
| 2008-09-05 08:30:00 | | RPC ICA On [13hrs 15min] |
|
| 2008-09-05 08:35:21 | | SR obs. around closest approach [10hrs 0min] |
|
| 2008-09-05 08:45:00 | | ALICE exosphere search [23hrs 10min] |
|
| 2008-09-05 11:27:48 | | VR light curve (VIRTIS M) [6hrs 30min] |
|
| 2008-09-05 11:37:48 | | MUPUS [17hrs 0min] |
|
| 2008-09-05 12:45:00 | | Slew to Steins in MIRO smm boresight [5min] |
|
| 2008-09-05 12:45:00 | | Boresight for VR01 changes from AL narrow slit to MIRO smm [5min] |
|
| 2008-09-05 12:45:00 | | Boresight for SR05a changes from AL narrow slit to MIRO smm [5min] |
|
| 2008-09-05 13:07:48 | | MR On-MR approach observations [5hrs 8min] |
|
| 2008-09-05 14:00:00 | | GD On [3hrs 0min] |
|
| 2008-09-05 16:47:48 | | DFMS spectra and COPS pressure measurement [12hrs 42min] |
|
| 2008-09-05 17:37:48 | | SESAME [1hrs 18min] |
|
| 2008-09-05 17:57:48 | | Spacecraft attitude flip [20min] |
|
| 2008-09-05 18:17:48 | | Slew to Steins in Closest Approach Co-operation boresight [1min] |
|
| 2008-09-05 18:18:48 | | Asteroid flyby mode [1hrs 19min] |
|
| 2008-09-05 18:26:48 | | MR03 Asteroid flyby mode observations [22min] |
|
| 2008-09-05 18:27:48 | | AL09 Asteroid UV surface spectrum [5hrs 10min] |
|
| 2008-09-05 18:35:21 | | SR06 Observations at phase angle 0 [1min] |
|
| 2008-09-05 18:35:51 | | Passage through zero phase angle |
|
| 2008-09-05 18:37:48 | | Steins Closest Approach |
|
| 2008-09-05 18:48:48 | | MR04 [5hrs 0min] |
|
| 2008-09-05 18:56:23 | | SESAME [41min] |
|
| 2008-09-05 19:03:48 | | VR03 Thermal background evolution [2hrs 0min] |
|
| 2008-09-05 19:37:48 | | HGA points to Earth again. HGA motion. HGA motion may result in degraded tracking accuracy of S/C z-axis. [27min] |
|
| 2008-09-06 00:30:00 | | Slew to SR sky background position [1hrs 0min] |
|
| 2008-09-06 01:30:00 | | SR07 Sky background for SR post-CA observations [10min] |
|
| 2008-09-06 05:30:00 | | SESAME Requires wheel off-loading [34min] |
|
| 2008-09-06 05:30:00 | | Wheel OffLoading [1hrs 15min] |
|
| 2008-09-06 06:55:00 | | DFMS mass spectrum [11hrs 5min] |
|
| 2008-09-06 14:30:00 | | Slew to sky background position of AL closest approach operations [2hrs 0min] |
|
| 2008-09-06 16:45:00 | | AL10 Sky background for AL Closest Approach observations [6hrs 0min] |
|
| 2008-09-06 22:45:00 | | Slew to sky background position of AL exosphere search [2hrs 0min] |
|
| 2008-09-07 00:45:00 | | AL11 Sky background for SA exosphere search [6hrs 0min] |
|
| 2008-09-07 06:45:00 | | AL02 ALICE decontamination [1hrs 0min] |
|
| 2008-09-07 14:00:00 | | Slew back to GSEP [2hrs 0min] |
|
| 2008-09-07 18:00:00 | | Slew to Galactic bulge [2hrs 0min] |
|
| 2008-09-07 20:00:00 | | SRGrav. SR Gravitational lensing observations [4hrs 0min] |
|
| 2008-09-08 00:00:00 | | Slew back to GSEP [2hrs 0min] |
|
| 2008-09-08 10:00:00 | | CS collect and image target [3hrs 20min] |
|
| 2008-09-12 14:00:00 | | Slew to Galactic bulge [2hrs 0min] |
|
| 2008-09-12 16:00:00 | | SR Gravitational lensing observations [4hrs 0min] |
|
| 2008-09-12 20:00:00 | | Slew back to GSEP [2hrs 0min] |
|
| 2008-09-16 14:00:00 | | Slew to Galactic bulge [2hrs 0min] |
|
| 2008-09-16 16:00:00 | | SR Gravitational lensing observations [4hrs 0min] |
|
| 2008-09-16 20:00:00 | | Slew back to GSEP [2hrs 0min] |
|
| 2008-09-21 14:00:00 | | Slew to Galactic bulge [2hrs 0min] |
|
| 2008-09-21 16:00:00 | | SR Gravitational lensing observations [4hrs 0min] |
|
| 2008-09-21 20:00:00 | | Slew back to GSEP [2hrs 0min] |
|
| 2008-09-25 14:00:00 | | Slew to Galactic bulge [2hrs 0min] |
|
| 2008-09-25 16:00:00 | | SR Gravitational lensing observations [4hrs 0min] |
|
| 2008-09-26 20:00:00 | | Slew back to GSEP [2hrs 0min] |
|
| 2008-09-30 14:00:00 | | Slew to Galactic bulge [2hrs 0min] |
|
| 2008-09-30 16:00:00 | | SR Gravitational lensing observations [4hrs 0min] |
|
| 2008-09-30 20:00:00 | | Slew back to GSEP [2hrs 0min] |
|
| 2008-10-04 14:00:00 | | Slew to Galactic bulge [2hrs 0min] |
|
| 2008-10-04 16:00:00 | | SR Gravitational lensing observations [4hrs 0min] |
|
| 2008-10-04 20:00:00 | | Slew back to GSEP [2hrs 0min] |
|
| 2008-12-16 | | Apohelion |
|
| 2009-11-13 07:45:40 | | Earth Flyby 3 (2,481km above Java. 48,018km/h.) |
|
| 2009-11-22 09:27:55 | | Perihelion (0.981AU. Speed 140,286km/h) |
|
| 2010-07-09 00:00:00 | | Start TCM slot |
|
| 2010-07-09 02:59:59 | | End TCM slot |
|
| 2010-07-09 03:00:00 | | Start last image acquisition for navigation planning |
|
| 2010-07-09 08:00:00 | | End last image acquisition for navigation planning |
|
| 2010-07-09 22:00:00 | | Start - Rosetta NAVCAM asteroid tracking |
|
| 2010-07-10 03:00:00 | | Start - TCM slot (AFB - 12h) - Loss of TM signal from Rosetta |
|
| 2010-07-10 05:59:59 | | End - TCM slot (AFB - 12h) - Acquisition of TM signal |
|
| 2010-07-10 06:00:00 | | Final NAVCAM asteroid tracking check |
|
| 2010-07-10 11:24:53 | | Start Rosetta flip manoeuvre |
|
| 2010-07-10 12:04:53 | | End Rosetta flip manoeuvre |
|
| 2010-07-10 12:44:53 | | Start asteroid closed-loop tracking - Rosetta on self-navigation |
|
| 2010-07-10 15:39:53 | | Stop - radio communications via high-gain antenna - Loss of TM signal (earliest) |
|
| 2010-07-10 15:44:56 | | Closest approach to Lutetia |
|
| 2010-07-10 15:54:53 | | End asteroid closed-loop tracking |
|
| 2010-07-10 16:00:00 | | Start webcast - Media event live from ESA/ESOC |
|
| 2010-07-10 16:19:53 | | Resume radio communications via high-gain antenna - Acquisition of TM signal (latest) |
|
| 2010-07-10 16:47:00 | | Webcast pause |
|
| 2010-07-10 17:40:21 | | Start science data downlink |
|
| 2010-07-10 21:00:00 | | Resume webcast - media event live from ESA/ESOC - Science team present images |
|
| 2010-07-10 21:45:00 | | End webcast |
| 2010-09-09 09:25:14 | | = = = Current Time = = = |
| 2011-05-01 | | Enter hibernation |
|
| 2014-01-01 | | Exit hibernation |
|
| 2014-05-01 | | Comet arrival |
|
| 2014-08-01 | | Comet mapping |
|
| 2014-11-01 | | Comet landing |
|
| 2015-08-01 | | Perihelion passage |
|
| 2015-12-31 | | End primary mission |